That includes a full cycle of production of a turnkey steel tank - from drawings to delivery
🔧 1. Pre -projected preparation and development of km/kmd
Construction of a turnkey tank begins with the development of design documentation: drawings km (metal structures) and KMD (metal detailed structures). At this stage, experts take into account the purpose of the tank (for petroleum products, water, technical liquids, etc.), the required volume (RVS-100, RVS 200, RVS-500, RVS-1000, etc.), climatic conditions, category of terrain, as well as technical requirements in accordance with DSTU and current building standards of Ukraine. The project takes into account the type of bottom (flat or conical), type of roof (stationary or floating), the need for strapping, hatches, ladders, inspection sites.
🏗️ 2. Making a steel tank
After the drawing is approved, the manufacture begins. The production of metal structures occurs at the factory using certified steel (mainly steel 3 or steel 09G2C). Production of the body of the tank (cylinder), bottoms, roofs, nozzles and hatches is made taking into account future welding connections. Each weld is controlled by non -destructive methods (ultrasound, capillary control), which guarantees tightness and strength. All elements of TSVS-100, RVS-200, RVS-500 and above are completed according to the specification.
🚛 3. Delivery, installation and installation on the object
Upon completion of production, all components of the tank are transported to the customer. Installation of the tank is performed using cranes and special equipment. At the site is welded of the sections of the case, installation of roof, installation of flanges, stairs, straps. The foundation is prepared in advance-the concrete base must correspond to the projected load from the full tank (for example, the RVS-500 contains 500 m³ of liquid, which gives a load of up to 500 tons).
🧪 4. Hydraulic tests and anti -corrosion protection
After installation, the tank undergoes hydraulic tests for tightness - it is filled with water and maintained under pressure. This allows you to detect possible leakage. Further, the internal and outer surfaces of the tank undergo anti -corrosion treatment. Usually it is sandblasting with further application of multilayered coatings: epoxy, polyurethane or zinc systems. Specialized chemically resistant formulations are used for tanks that store aggressive liquids.
🧾 5. The commissioning
After all the work is completed, the tank is prepared for delivery. The control inspection is conducted, technical documentation, testing acts, welding control protocols and certificates for materials are carried out. The Orientation of LTD guarantees compliance with the constructed tanks to the standards and provides complete support for commissioning of the object. Reservoirs such as RVS-100, RVS-200, RVS-500 or more can be put into operation within 30-90 days depending on the complexity and location of the project.
🔚 The conclusion of
 turnkey reservoirs is a complete engineering cycle: from projection to start. The reliability, tightness and durability of such tanks are ensured by compliance with all technical standards at each stage. Choosing the Orientation of LTD, you get not only high -quality metal structures, but also a safe, fully prepared solution for storage of liquids.