Get a project estimate
30 minutes after receiving the application, we will announce the price

Blog

We are tank construction experts with over 30 years of experience. We offer individual solutions to improve your production processes at every stage of the project — from design to installation.

How to check the quality of a steel tank before commissioning

Comprehensive inspection of RVS: testing, non-destructive testing, reports and practical advice for reliable operation.

Mistakes when installing steel tanks and how to avoid them

Tank installation is a critical stage that determines the reliability, tightness, and durability of the RVS. We will consider the most common mistakes that occur during the installation of RVS-100, RVS-200, RVS-500, and larger tanks, and also share practical tips on how to avoid them.

That includes a full cycle of production of a turnkey steel tank - from drawings to delivery

Production of turnkey steel tank: projection, manufacture, installation, anti -corrosion protection, delivery.

The service life of the steel tank: the main factors and how to control them

Which affects the service life of RVS: main risks, protection and control.

What types of tanks are used for petroleum products: Comparison and purpose

Comparison of types of tanks for petroleum products: vertical, horizontal, underground - advantages and purpose.

Anti -corrosion protection of tanks: methods, materials and importance for durability

The article on how anti -corrosion protection of tanks extends their service life, prevents leaks and reduces service costs.

The main stages of construction of tanks for storage of petroleum products and other liquids

The construction of tanks for storage of liquids, such as petroleum products, water or chemicals, is a complex process that requires careful planning, compliance with technical standards and the use of quality materials. Let's look at the key stages of this process.

Norms and standards for the design and operation of VST in Ukraine

In this article, we will consider the main standards that need to be taken into account when designing and operating a nuclear power plant in Ukraine.

Reviews

"ESKO PIVNICH" LLC
The works under these contracts were completed in full.
There are no complaints about metal structures, installation and anti-corrosion works.
Deputy General Director for Production
S.I. Sadymaka
PJSC "UKRNAFTA"
The works under these contracts were completed in full within the specified time and with high quality.
Operations manager
O.A. Kasha
UNB
The installation of the tank on the territory of our enterprise was carried out with high quality and on time.
Head of the mining department
T.V. Kachmarik
D. Tech
All deliveries of the above-mentioned products were made of appropriate quality. There are no comments on the quality of the supplied equipment. The contract was fulfilled in full, no product defects were found.
Director
T. Shilkina
Get a project estimate
30 minutes after receiving the application, we will announce the price
Thank you!

We
Oops! Something went wrong while submitting the form.