Get a project estimate
30 minutes after receiving the application, we will announce the price

Blog

We are experts in tank construction with over 30 years of experience. We offer customized solutions to improve your production processes at every stage of the project - from design to installation.

How to check the quality of a steel tank before commissioning

Comprehensive inspection of RVS: testing, non-destructive testing, reports and practical advice for reliable operation.

Mistakes when installing steel tanks and how to avoid them

Tank installation is a critical stage that determines the reliability, tightness, and durability of the RVS. We will consider the most common mistakes that occur during the installation of RVS-100, RVS-200, RVS-500, and larger tanks, and also share practical tips on how to avoid them.

What does the full cycle of turnkey steel tank production include - from drawings to delivery?

Turnkey steel tank production: design, manufacturing, installation, corrosion protection, delivery.

Steel tank service life: main factors and how to control them

What affects the service life of a PVS: main risks, protection and control.

What types of tanks are used for petroleum products: comparison and purpose

Comparison of types of tanks for petroleum products: vertical, horizontal, underground - advantages and purposes.

Anti-corrosion protection of tanks: methods, materials and importance for durability

An article about how corrosion protection of tanks extends their service life, prevents leaks, and reduces maintenance costs.

The main stages of construction of tanks for storing petroleum products and other liquids

Building tanks for storing liquids such as petroleum products, water, or chemicals is a complex process that requires careful planning, adherence to technical standards, and the use of quality materials. Let's take a look at the key steps in this process.

Norms and standards for the design and operation of RVS in Ukraine

In this article, we will consider the main standards that must be taken into account when designing and operating RVS in Ukraine.

Reviews

LLC "ESCO NORTH"
The work under these contracts was completed in full.
There are no complaints about the metal structures, installation and anti-corrosion work.
Deputy General Director for Production
S.I. Sadymaka
PJSC "UKRNAFTA"
The work under these contracts was completed in full, within the specified time frame and with high quality.
Operations Manager
O.A. Kasha
UNB
The installation of the tank on the territory of our company was carried out qualitatively and on time.
Head of the Mining Department
T.V. Kachmarik
D.Tek
All deliveries of the above-mentioned products were of proper quality. There are no comments on the quality of the supplied equipment. The contract was fulfilled in full, no defects in the goods were found.
Director
T. Shilkina
Get a project estimate
30 minutes after receiving the application, we will announce the price
Thank you!

We
Oops! Something went wrong while submitting the form.