Vertical steel tank (VST 2000) for PJSC Ukrnafta [2]

Development of KM/KMD, production of the tank, delivery, installation, anti-corrosion protection with sandblasting of the surface

Location

with. Mala Pavlivka, Sumy region

volume

3x2000

Appointment

Storage of commodity oil

Material

Steel 3

From application to delivery

240 days

At this facility, work was carried out on the installation of 2000m3 storage tanks in the amount of 3 units and internal anti-corrosion protection of these tanks. 180 tons of metal structures were assembled and 3,300 m2 of the inner surface of the tanks were painted.

All services provided by us were performed with tight deadlines and the highest standards.

All works were completed on time and their term was 240 calendar days.