Vertical steel tank (VST 5000) for PJSC "Ukrnafta" [1]
Development of KM/KMD, tank production, delivery



11.jpg)
Location
volume
Appointment
Material
From application to delivery
The project began with the delivery of a large steel tank to the object. To do this, a special low -kotramic platform was used to safely transport heavy structures. The transportation of such equipment requires careful preparation of the route and the choice of appropriate transport to avoid damage to the tank during the journey.

The next important stage is the preparation of the foundation. At the site of the installation was a marking and earthworks were started. The concrete foundation plays a key role in the stability of the structure, providing a reliable base for the tank. It is important that the foundation is properly leveled and designed for the weight of a full tank with a liquid.

After the preparation of the foundation, the installation of the tank began. Large steel panels were raised with special equipment and carefully installed on the foundation. This stage requires special accuracy, as it is necessary to ensure a tight connection of steel sheets so that the tank is completely sealed.
11.jpg)