Rozhovsky water tower for Vitchizna LLC
Water tower
Location
volume
Appointment
Material
From application to delivery
The project of lowering the water tower with a volume of 160 m³ began with preparatory work. At the site of the future construction, geodetic studies were carried out to ensure the correct marking and determine the optimal location for the foundation. The preparation of the base included earthworks and the pouring of a reinforced concrete foundation, which ensures the stability and durability of the tower even in difficult weather conditions.
The next stage is the production of metal structural elements. The steel tank was made of certified materials, which guarantees its durability and resistance to corrosion. In addition, great attention was paid to the tightness of the joints, as this is critical for the preservation of water and ensuring the reliability of the system.
The installation of the water tower was carried out using special equipment for lifting large metal structures to a height. The tank was fixed on a support structure that can withstand the load of the full volume of water. During installation, the accuracy of the connections was ensured to avoid possible leaks or deformations.
The final stage is painting and anti-corrosion treatment. For this, special protective coatings were used, which ensure long-term operation of the structure without loss of functional characteristics. The tower was also equipped with pipelines, shut-off valves and necessary devices for controlling the water level.