Vertical steel tank (PVS 5000) for PJSC "Ukrnafta" [1]
Development of KM/KMD, tank manufacturing, delivery



11.jpg)
Location
Volume
Appointment
Material
From application to delivery
The project began with the delivery of a large steel tank to the site. A special low-bed platform was used to transport heavy structures safely. Transportation of such equipment requires careful route preparation and selection of appropriate transport to avoid damage to the tank during the journey.

The next important stage is the preparation of the foundation. The installation site has been marked out and excavation work has begun. The concrete foundation plays a key role in the stability of the structure, providing a solid foundation for the tank. It is important that the foundation is properly leveled and designed to support the weight of the full tank with liquid.

Once the foundation preparation was complete, the installation of the tank began. Large steel panels were lifted using special equipment and carefully placed on the foundation. This stage requires special precision, as it is necessary to ensure a tight connection of the steel sheets so that the tank is completely airtight.
11.jpg)