Vertical steel tanks for D.Tek

Development of KM/KMD, tank manufacturing, delivery, installation, anti-corrosion cleaning with sandblasting preparation inside and outside

Location

Semerinky village, Poltava region

Volume

2x700

Appointment

Hydrocarbon gas concentrate

Material

Steel 3

From application to delivery

55 days

The project implementation began with the development of design documentation (KM/KMD), which allowed for detailed work on all technical parameters of two vertical steel tanks with a volume of 2×700 m³. Steel 3 was used in the manufacturing process, which provides high strength and resistance to the effects of hydrocarbon gas concentrate. All welds underwent thorough quality control to guarantee the tightness of the structure.

The next stage was the delivery and installation of the tanks at the site. Specialized transport allowed for the safe transportation of large-sized structures, and installation work was carried out using lifting equipment. Great attention was paid to the accuracy of the connection of elements, which ensured the stability and durability of the structures.

The final stage was the protective coating of the tanks. The inner and outer surfaces were cleaned by sandblasting, after which an anti-corrosion coating was applied, which guarantees the durability of the tanks even in an aggressive environment. All work was completed within the specified time frame — 55 days. Thanks to an integrated approach, the project was successfully implemented, taking into account all safety requirements and operational standards.