Get a project estimate
30 minutes after receiving the application, we will announce the price

Experts in the manufacture of vertical steel tanks for liquids

Turnkey tanks 100% for your needs

Your reliable partner in the creation of vertical steel tanks

Since 1992, Orient LTD has been providing a full range of services in the design, construction, and installation of vertical steel tanks (VST) and tank farms. We are an experienced partner who works closely with you at every stage of the project. Our commitment, expertise, and in-house production capabilities allow us to manufacture VST tanks ranging from 10m³ to 5000m³, delivered on time and tailored to your specific needs. We offer proactive solutions to ensure our tanks fully meet your requirements and efficiently support your production processes. At every stage of the project, our experts demonstrate dedication, innovative approaches, and a high level of professionalism.
More about us
Button Image
Reservoirs Image

Certified quality at all stages

Production, products and specialists are certified according to international standards, which guarantees high quality of work

Modern methods of welding

We use automatic welding machines, which allows us to achieve excellent quality of welds in the VST and reduce production times

Quality control of welds

All welds of tanks are inspected by non -destructive control methods that ensures reliability, quality and durability

Quality guarantee

We provide a guarantee for vertical steel tanks for a period of 4+ years, which is more than the average value in the industry in Ukraine

Own production facilities

Thanks to our large in-house production, we can promptly fulfill orders of any volume

World-class trust

More than 30 global customers have chosen us as a reliable partner, trusting experience and quality in production and logistics

Adaptive solutions for your industry

We create standard RVS as well as according to your parameters and modifications. In accordance with the requirements, we will manufacture additionally protected, insulated, equipped with heaters, stirrers and sensors for optimal operation in your conditions of VST

A full cycle of work on our own

We perform the project, manufacturing, delivery, installation and additional work on your own, which can significantly reduce the time of work, be sure of the quality and fully responsible for the result
Reservoirs Image
We are engaged in the manufacture and installation of vertical steel tanks of any configurations for your needs with the highest guarantee in Ukraine
To the manufacturing page
Button Image
Reservoir Image
We are engaged in the restoration of damaged and destroyed infrastructure of oil refining, gas processing and related enterprises. We give a second life with a guarantee
To the repair page
Button Image
Whatsapp Logo
View Project

Project for repairing 3 vertical steel tanks

Departure to the object for inspection, study of technical documentation and drawing up a plan of repair with the development of commercial offer, repair work, hydraulic tests, anti -corrosion protection.

Location

Customer covered

volume

3x700

Appointment

Petroleum products

Material

Steel 3

From application to delivery

180 days
View Project

Construction of a steel vertical tank

Development of KM/KMD, production of the tank, delivery, installation, anti-corrosion cleaning with sandblasting inside and outside

Location

Customer hidden

volume

700

Appointment

Petroleum products

Material

Steel 3

From application to delivery

40 days
View Project

A projected renovation of a vertical steel tank

Development of KM/KMD, production of the tank, delivery, installation, anti-corrosion cleaning with sandblasting inside and outside

Location

The location is hidden

volume

2000

Appointment

Formation water

Material

Steel 3

From application to delivery

90 days
View Project

Vertical steel tanks for the Gold-Nafta company

Development of KM/KMD, production of the tank, delivery, installation, anti-corrosion cleaning with sandblasting inside and outside

Location

Ukraine

volume

2x1350

Appointment

Formation water

Material

Steel 3

From application to delivery

53
View Project

VST for the Perechyn wood chemical plant

Development of KMD drawings, production of the tank, delivery.

Location

Location

volume

1000

Appointment

Formation water

Material

Steel 3

From application to delivery

120 days
View Project

Vertical steel tanks for D.Tek

Development of KM/KMD, production of the tank, delivery, installation, anti-corrosion cleaning with sandblasting inside and outside

Location

with. Semerinky, Poltava region

volume

2x700

Appointment

Hydrocarbon gas concentrate

Material

Steel 3

From application to delivery

55 days
View Project

Vertical steel tanks for Eridon

Development of KM/KMD, production of the tank, delivery, installation, anti-corrosion cleaning with sandblasting inside and outside

Location

Location

volume

2x2570

Appointment

Formation water

Material

Steel 3

From application to delivery

120 days
View Project

Reservoir VST 5000 for PJSC Ukrnafta [3]

Development of KM/KMD, tank production, delivery

Location

with. Mala Pavlivka, Okhtyr District, Sumy Region

volume

5000

Appointment

Storage of crude oil

Material

Steel 3

From application to delivery

180 days
View Project

Vertical steel tank (VST 2000) for PJSC Ukrnafta [2]

Development of KM/KMD, production of the tank, delivery, installation, anti-corrosion protection with sandblasting of the surface

Location

with. Mala Pavlivka, Sumy region

volume

3x2000

Appointment

Storage of commodity oil

Material

Steel 3

From application to delivery

240 days
View Project

Vertical steel tank (VST 5000) for PJSC "Ukrnafta" [1]

Development of KM/KMD, tank production, delivery

Location

Chernihiv region, Prylutsky district

volume

5000

Appointment

Formation water

Material

Steel 3

From application to delivery

60 days
View Project

Rozhovsky water tower for Vitchizna LLC

Water tower

Location

Shevchenkivske village of Konotop district

volume

160

Appointment

Water

Material

Steel 3

From application to delivery

50 days
View Project

Horizontal steel tanks (HST 50) for D.Tek

Equipment: Condensate storage capacity PN atm. V=50 m 3 - 4 pcs. Oil trap NVspv PN atm. V=30m 3 - 1 pc. Storage capacity of inhibitor PN atm. V=50 m 3 - 2 pcs. Storage tank for associated formation water PN atm. V=50 m 3 - 2 pcs. Diesel fuel capacity PN atm. V=30 m 3 - 1 pc. Filter for cleaning the inhibitor DN50/400, PN 1.6 MPa. 4 levels of filtration - 1 pc

Location

Mayorivska UKPG

volume

10x50

Appointment

liquids

Material

Steel 3

From application to delivery

150 days
View Project

Vertical steel tanks (RVS 400) for the UNB company

Development of KM/KMD, production of the tank, delivery, installation, anti-corrosion cleaning with sandblasting inside and outside

Location

Location

volume

2x400

Appointment

Formation water

Material

Steel 3

From application to delivery

79 days
View Project

Repair of a vertical steel tank for BS OIL

Development of KM/KMD, production of the tank, delivery, installation, anti-corrosion cleaning with sandblasting inside and outside

Location

The location is hidden

volume

2000

Appointment

Formation water

Material

Steel 3

From application to delivery

65 days

Reviews

"ESKO PIVNICH" LLC
The works under these contracts were completed in full.
There are no complaints about metal structures, installation and anti-corrosion works.
Deputy General Director for Production
S.I. Sadymaka
PJSC "UKRNAFTA"
The works under these contracts were completed in full within the specified time and with high quality.
Operations manager
O.A. Kasha
UNB
The installation of the tank on the territory of our enterprise was carried out with high quality and on time.
Head of the mining department
T.V. Kachmarik
D. Tech
All deliveries of the above-mentioned products were made of appropriate quality. There are no comments on the quality of the supplied equipment. The contract was fulfilled in full, no product defects were found.
Director
T. Shilkina
Get a project estimate
30 minutes after receiving the application, we will announce the price
Thank you!

We
Oops! Something went wrong while submitting the form.

Blog